Application : Cement Plant Clinker Grinding Unit, Steel Mill

Annual Output : 200,000-1,000,000 tons

Power Consumption : 35-45 kWh/t

Blaine Fineness : 4200-4500 cm²/g

Get solution and support:
I am interested in (*) , raw material is , the production capacity is t/h, send email to (*) . Name: (*) Phone: Country:

GGBS Production Line Features

As a new type of high performance concrete admixture, slag powder has all kinds of performance advantages about improving concrete compressive resistance, tensile resistance, sheared resistance and bended resistance. At present, with the same amount of slag powder instead of concrete and cement product of cement dosage, which has become the main trend of building materials industry. The Great Wall machinery is a professional supplier of slag powder production line, can provide "turnkey" service from civil engineering to debugging and capacity and standard reaching to customers, let customers put into production of mineral powder with saving worry, saving effort and high-efficiency.

slag grinding plant

1. A good return on investment, can recover the cost-effective

With the application widely of mineral powder, the domestic market demand increase rapidly in this project. Investment powder production line with considerable economic benefit and high return on investment, usually 1-3 years can recover the cost.

2. High efficiency, energy saving, environmentally friendly

GRMS series slag vertical mill can reduce power consumption effectively in the process of production as the core equipment of production line. Meanwhile, because it is a negative pressure operation, vertical mill produces almost no dust during operation, low noise and pollution than traditional tube mill.

3. Mature general contrasting scheme

Chaeng has the domestic first-class technical team, and combined with domestic chief vertical expert for technology. Great Wall Machinery can design detail general scheme according to customer's actual situation, and can provide "turnkey service" from civil engineering to production operation.

4. The customers case witness all over the country.

Chaeng GGBS production line has been recognized by key customers, the domestic production operation of the production line has been up to more than 30, customers all over the country.

Process Description

The stacked slag is packed and feed by the forklift trucks, then transported by belt conveyor. During transmission, the slag will pass through the iron separator and vibrating screen, then through the weighing equipment and elevator, and finally come into the vertical roller mill.slag will come through the powder selector and be dried with the hot air form air heating furnace after grinding. Slag that meets the fineness requirement will pass through the separator, then delivered by air blower and elevator, and finally come to the storage silo.

Slag Grinding Plant Workflow Diagram

Configuration

     

Output (t/a)
Model of Vertical Roller Mill
Capacity (t/h)
Mill Power Consumption (kWh/t)
Grinding System Power Consumption (kWh/t)
Coal Consumption (kg/t)
200,000
GRMS26.21
30
32
 
 
300,000
GRMS33.31
50
30
42
18
450,000
GRMS40.41
70
30
 
18
600,000
GRMS46.41
105
28.5
37
18
1,000,000
GRMS53.41
160
26.5
35
17

 

 

  • 300,000 t/a
  • 600,000 t/a
  • 1,000,000 t/a
  • Equipments of Production Line

    Equipment Type: GRMS33.31 Slag Vertical RollerMill

    Power Consumption of system: 30 kWh/t

    Standard Production Capacity: 50 t/h

    Effective Diameter of Millstone: 3300 mm

    Number of Roller: 3

  • Equipment of Production Line

    Equipment Type: GRMS46.41 Slag Vertical Roller Mill

    Power Consumption of System: 38 kWh/t

    Standard Production Capacity: 105 t/h

    Effective Diameter of Millstone: 4600 mm

    Number of roller: 4

    Specific surface: 4200~4500cm2/g

  • Equipment of Production Line

    Equipment Type: GRMS53.41 Slag Vertical Roller Mill

    Power Consumption of System: 40 kWh/t

    Standard Production Capacity: 160 t/h

    Effective Diameter of Millstone: 5300 mm

    Number of Roller: 4

    Specific Surface: 4200~4500 cm2/g

  • 1,000 t/d Clinker
  • 2,500 t/d Clinker
  • 3,000 t/d Clinker
  • 4,000 t/d Clinker
  • 5,000 t/d Clinker
  • Production Line Equipments

    a. GRMR22.30 Raw Material Vertical Roller Mill

    b. GRMC12.30 Soft Coal Vertical Roller Mill

    c. φ3.2×48 Rotary Kiln

    d. φ3.8×13 Cement Mill

  • Production Line Equipments

    a. GRMR38.41Raw Material Vertical Roller Mill

    b. GRMC20.30Soft Coal Vertical Roller Mill

    c. φ4.0×60 Rotary Kiln

    d. φ4.2×13 Cement Mill (2 Sets)

  • Production Line Equipments

    a. GRMR40.41 Raw Material Vertical Roller Mill

    b. GRMC22.30 Soft Coal Vertical Roller Mill

    c. φ4.2×60 Rotary Kiln

    d. φ4.2×13 Cement Mill (2 Sets)

  • Production Line Equipments

    a. GRMR48.41 Raw Material Vertical Roller Mill

    b. GRMC23.30 Soft Coal Vertical Roller Mill

    c. φ4.5×66 Rotary Kiln

    d. φ4.2×13 Cement Mill (2 Sets)

  • Production Line Equipments

    a. GRMR53.41 Raw Material Vertical Roller Mill

    b. GRMC26.30 Soft Coal Vertical Roller Mill

    c. φ4.8×72 Rotary Kiln

    d. φ4.2×13 Cement Mill (3 Sets)